Search

  • Select Article Type
  • Abstract Supplements
  • Blood Group Review
  • Call to Arms
  • Hypothesis
  • In Memoriam
  • Interview
  • Introduction
  • Short Report
  • abstract
  • Abstracts
  • Article
  • book-review
  • case-report
  • case-study
  • Clinical Practice
  • Commentary
  • Conference Presentation
  • conference-report
  • congress-report
  • Correction
  • critical-appraisal
  • Editorial
  • Editorial Comment
  • Erratum
  • Events
  • Letter
  • Letter to Editor
  • mini-review
  • minireview
  • News
  • non-scientific
  • Obituary
  • original-paper
  • Original Research
  • Pictorial Review
  • Position Paper
  • Practice Report
  • Preface
  • Preliminary report
  • Product Review
  • rapid-communication
  • Report
  • research-article
  • Research Communicate
  • research-paper
  • Research Report
  • Review
  • review -article
  • review-article
  • review-paper
  • Review Paper
  • Sampling Methods
  • Scientific Commentary
  • short-communication
  • short-report
  • Student Essay
  • Varia
  • Welome
  • Select Journal
  • Architecture Civil Engineering Environment

 

research-article | 17-April-2021

ANALYSIS OF FEES FOR CONNECTING THE INFRASTRUCTURE OF GENERALLY ACCESSIBLE CHARGING STATIONS TO NETWORKS WITH RATED VOLTAGE NOT HIGHER THAN 1 KV

of the connection fee is specified in the connection agreement. Entity which is being connected pays the connection fee to the Distribution Company, which is the party of the connection agreement. The Distribution System Operator (represented by a distribution company) covers the costs of the metering and billing system (meter). Conclusion of a connection agreement for a power value of 25 kW generates a connection fee for the entity accounted at PGE Dystrybtion S.A. in the amount of: A. General

Anna ŚLĘZAK

Architecture, Civil Engineering, Environment, Volume 14 , ISSUE 1, 107–114

No Record Found..
Page Actions