USING MAMCA FOR SELECTING TOLL ROAD TRACE TO WEST JAVA SEAPORT, INDONESIA

Publications

Share / Export Citation / Email / Print / Text size:

Transport Problems

Silesian University of Technology

Subject: Economics, Transportation, Transportation Science & Technology

GET ALERTS

eISSN: 2300-861X

DESCRIPTION

8
Reader(s)
9
Visit(s)
0
Comment(s)
0
Share(s)

VOLUME 16 , ISSUE 3 (September 2021) > List of articles

USING MAMCA FOR SELECTING TOLL ROAD TRACE TO WEST JAVA SEAPORT, INDONESIA

Heru Purboyo Hidayat PUTRO * / Aditya ROSADI

Keywords : MAMCA; seaport; stakeholders; toll road; west java; Indonesia

Citation Information : Transport Problems. Volume 16, Issue 3, Pages 77-87, DOI: https://doi.org/10.21307/tp-2021-043

License : (CC BY 4.0)

Received Date : 03-June-2020 / Accepted: 10-September-2021 / Published Online: 30-September-2021

ARTICLE

ABSTRACT

The construction of Patimban Port in West Java Province has a potential to increase the flow of exported and imported goods in West Java. The increase will have an impact on the rising traffic flow of vehicles to or from Patimban port. The government has included the construction of the Subang-Patimban toll road in the national spatial plan. This research analyzes stakeholders and the criteria that they expect in the selection of alternative routes to Patimban port. The Multi Actor Multi Criteria Analysis (MAMCA) methodology used aims to evaluate differences in criteria between stakeholders. The selection of alternatives for all stakeholders uses two calculation methods or scenarios, namely, the similarity of weight for all stakeholders as scenario I and weighting the number of criteria considered by stakeholders in determining the alternative chosen trace as scenario II. The result of the selected alternative calculation is different between scenario I and scenario II.

Content not available PDF Share

FIGURES & TABLES

REFERENCES

1. Adisasmita, S.A. Perencanaan infrastuktur transportasi wilayah. [In Indonesian: Regional transport infrastructure planning]. Pertama. Yogyakarta: Graha Ilmu. 2012. 203 p.

2. BAPPENAS. Public private partnerships: Infrastructure project plan in Indonesia 2017. Jakarta: Bappenas. 2017. 157 p.

3. Baudry, G. & Macharis, C. &. Vallée, T. Range-based Multi-Actor Multi-Criteria Analysis: a combined method of Multi-Actor Multi-Criteria Analysis and Monte Carlo Simulation to support participatory decision making under uncertainty. European Journal of Operational Research. 2018. Vol. 264(1). P. 257-269. DOI: 10.1016/j.ejor.2017.06.036.

4. Ginanjar, R.A.F. Analisis hubungan produktivitas nasional dengan transportasi jalan, kereta api, laut dan udara. [In Indonesian: Analysis of national productivity for road, train and air transportation]. Master Thesis. Bandung: Institut Teknologi Bandung. 2015. 127 p.

5. Ibrahim, F. & Samang, M. Pendekatan analisis multi kriteria untuk pemilihan trase jalan di kawasan terisolasi di Aralle Tabulahan Mambi Provinsi Sulawesi Barat. [In Indonesian: Multi criteria analysis approach in the selection of road traces in isolated area of Aralle Tabulahan Mambi West Sulawesi Province]. Gorontalo: Universitas Gorontalo. 2010. 130 p.

6. Ibrahim, F. & Pangeran, M.H. Pendekatan analytic network process dalam pemilihan trase jalan. (Studi kasus pengembangan jaringan jalan kolektor Provinsi Gorontalo). [In Indonesian: Using ANP for trace road selection in isolated area in Province of Gorontalo]. Gorontalo: Universitas Gorontalo. 2013. 160 p.

7. Jasa Marga. Prastudi kelayakan ruas jalan tol akses Patimban. [In Indonesian: Fre-FS on toll road access to Patimban]. Jakarta: Ministry of Public Work. 2017. 127 p.

8. JICA. Proyek studi rencana induk pembangunan pelabuhan dan logistik di wilayah Metropolitan Jakarta Raya di Republik Indonesia. [In Indonesian: Master Plan of Port and Logistic Development for Jakarta Metropolitan Area]. Vol. 2. Jakarta: Ministry of Transportation. 2011. 186 p.

9. JICA. The Preparatory survey on Patimban port development project. Jakarta: Ministry of Transportation. 2017. 223 p.

10. Justitia, R. & Luthfi, F.M. & Ludfi, D. & Bowoputro, H. Analisis perencanaan trase jalan tol Gempol-Mojokerto. [In Indonesian: Analysis of trace toll road plan]. Jurnal Mahasiswa Teknik Sipil Mahasiswa Brawijaya. 2017. Vol. 13. P. 93-107.

11. Karsaman, R. & Rodhiatun, R. & Harun, A.R. & Santoso, I. Kajian investasi pembangunan jalan tol di Indonesia berdasarkan sistem syariah: Studi kasus jalan tol Cikampek-Palimanan. [In Indonesian: Study on toll road development by shariah system for toll road CikampekPalimanan]. Jurnal Perencanaan Wilayah Dan Kota. 2015. Vol. 26(2). P. 86-99.

12. Macharis, C. & Baudry, G. (eds). Sustainability mobility and transport: Muli-Actor Multi-Criteria Analysis. 2018. Edward Elgar Publishing. 256 p.

13. Macharis, C. & De Witte, A. & Turcksin, L. The multi-actor multi-criteria analysis (MAMCA) application in the flemish long-term decision making process on mobility and logistics. Transport Policy. 2010. Vol. 17(5). P. 303-311. DOI: 10.1016/j.tranpol.2010.02.004.

14. Macharis, C. & Turcksin, L. & Lebeau, K. Multi actor multi criteria analysis (MAMCA) as a tool to support sustainable decisions: State of use. Decision Support Systems. 2012. Vol. 54(1). P. 610-620. DOI: 10.1016/j.dss.2012.08.008.

15. Pelindo II. Laporan tahunan 2017. [In Indonesian: Annual report 2017]. Jakarta: Ministry of Transportation. 2018. 220 p.

16. Pertamina. Wapres putuskan pelabuhan Cilamaya batal. [In Indonesian: Vice President decides to cancel the Cilamaya port plan]. Majalah Energia Pertamina. 2015. Vol. 4(2).

17. Rodrigue, J.P. The Geography of Transport System (3rd ed.). New York: Routledge. 2013. 432 p.

18. Saleb, S.M. & Tamin, O.Z. & Isya, M. Pemilihan trase jalan berdasarkan analisis multi kriteria (Kasus kelayakan highway lintas timur Provinsi NAD). [In Indonesian: Selection of road traces by multi criteria analysis for the case in Aceh Province]. Banda Aceh: University of Syah Kuala. 2007. 217 p.

19. Saodang, H. Konstruksi jalan raya: Buku 1 geometrik jalan. [In Indonesian: Construction of road: Book I road geometry]. Bandung: Nova. 2010. 172 p.

20. Sinha, K.C. & Labi, S. Transportation decision making. New York: John Wiley & Sons, Inc. DOI: 10.1002/9780470168073. 2007. 544 p.

21. Subang Regency Statistics Office. Subang dalam angka 2018. [In Indonesian: Subang Statistics]. Subang: BPS/Regency Statistics Office. 2018. 252 p.

22. Sukirman, S. Dasar-dasar perencanaan geometrik jalan. [In Indonesian: Introduction to road geometry planning]. Bandung: Nova. 1999. 180 p.

23. Tabucanon, M.T, & Lee, H.M. Multiple criteria evaluation of transportation system improvement projects: The case of Korea. Journal of Advanced Transportation. 1995. Vol. 29, No. 1. P. 127-143. DOI: 10.1002/atr.5670290110.

24. Turcksin, L. & Macharis, C. & Lebeau, K. & Boureima, F. & Van Mierlo, J. & Bram, S. & De Ruyck, J. A multi-actor multi-criteria framework to assess the stakeholder support for different biofuel options: The case of Belgium. Energy Policy. 2011. Vol. 39(1). P. 200-214. DOI: 10.1016/j.enpol.2010.09.033.

25. World Bank. 2018. Full LPI Dataset (2007-2018). 2018. 82 p. Available at: https://lpi.worldbank.org/sites/default/files/International_LPI_from_2007_to_2018.xlsx.

EXTRA FILES

COMMENTS